3 active projects totaling 224 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

5 Duke Energy queue filings name Robinson Plant - Florence as the point of interconnection, all in Darlington County, SC.

3active projects
224active MW
5total filed
Queue IDProjectkVMWResourceStatus
67146 Not reported 230 80 Solar Withdrawn
PP00004 Not reported n/r 74.9 Solar Active
PP00005 Not reported n/r 74.9 Solar Withdrawn
PP00008 Not reported n/r 74.9 Solar Active
PP00001 Not reported n/r 74.2 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.