Robinson-Florence substation interconnection queue

1 active project totaling 74.9 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

2 Duke Energy queue filings name Robinson-Florence as the point of interconnection, all in Darlington County, SC.

1active projects
74.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
PP00006 Not reported n/r 74.9 Solar Withdrawn
PP00009 Not reported n/r 74.9 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.