Perry Substation substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 6 with terminal status (shown grayed).

6 Duke Energy queue filings name Perry Substation as the point of interconnection, all in FL.

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
94 Not reported n/r 1,268 Gas Withdrawn
95 Not reported n/r 1,204 Gas Withdrawn
31 Not reported n/r 850 Coal Withdrawn
91 Not reported n/r 293 Gas Withdrawn
238 Not reported n/r 74.5 Solar Withdrawn
204 Not reported n/r 36 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.