0 active projects
totaling 0 MW in the Duke Energy queue, plus 6 with terminal status (shown grayed).
6 Duke Energy queue filings name Perry Substation as the point of interconnection, all in FL.
0active projects
0active MW
6total filed
Queue ID
Project
kV
MW
Resource
Status
94
Not reported
n/r
1,268
Gas
Withdrawn
95
Not reported
n/r
1,204
Gas
Withdrawn
31
Not reported
n/r
850
Coal
Withdrawn
91
Not reported
n/r
293
Gas
Withdrawn
238
Not reported
n/r
74.5
Solar
Withdrawn
204
Not reported
n/r
36
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.