0 active projects
totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).
2 Duke Energy queue filings name PEF Nuclear Substation as the point of interconnection, all in Levy County, FL.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
32
Not reported
n/r
1,150
Nuclear
Withdrawn
46
Not reported
n/r
1,150
Nuclear
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.