Substation Scout

PAGELAND TAP LINE substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name PAGELAND TAP LINE as the point of interconnection, all in Chesterfield County, SC.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
915761 Not reported 115 74.9 Solar Withdrawn
956721 Not reported 115 74.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first