Newberry Substation substation interconnection queue

1 active project totaling 74.5 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

8 Duke Energy queue filings name Newberry Substation as the point of interconnection, all in FL.

1active projects
74.5active MW
8total filed
Queue IDProjectkVMWResourceStatus
147A Not reported n/r 74.9 Solar Withdrawn
170 Not reported n/r 74.5 Solar Withdrawn
174 Not reported n/r 74.5 Solar Operational
225 Not reported n/r 74.5 Solar Withdrawn
241 Not reported n/r 74.5 Solar Withdrawn
189A Not reported n/r 40 Solar Withdrawn
136 Not reported n/r 30 Solar Withdrawn
155B Not reported n/r 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.