Mayo substation substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name Mayo substation as the point of interconnection, all in Person County, NC.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
33170 Not reported 500 1,350 Gas Withdrawn
33182 Not reported 500 602 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.