Substation Scout

Longtown Ret substation interconnection queue

1 active project totaling 4.6 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

2 Duke Energy queue filings name Longtown Ret as the point of interconnection, all in Fairfield County, SC.

1active projects
4.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
138500 Not reported n/r 4.6 Battery Withdrawn
561350 Not reported n/r 4.6 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first