Liberty Substation substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name Liberty Substation as the point of interconnection, all in Liberty County, FL.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
303 Not reported n/r 74.9 Solar Withdrawn
98 Not reported n/r 14 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.