Levy Substation substation interconnection queue
0 active projects totaling 0 MW in the Duke Energy queue, plus 10 with terminal status (shown grayed).
10 Duke Energy queue filings name Levy Substation as the point of interconnection, all in Levy County, FL.
0active projects
0active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 82 | Not reported | n/r | 418 | Gas | Withdrawn |
| 87 | Not reported | n/r | 418 | Gas | Withdrawn |
| 78 | Not reported | n/r | 223 | Gas | Withdrawn |
| 79 | Not reported | n/r | 223 | Gas | Withdrawn |
| 80 | Not reported | n/r | 223 | Gas | Withdrawn |
| 81 | Not reported | n/r | 223 | Gas | Withdrawn |
| 83 | Not reported | n/r | 223 | Gas | Withdrawn |
| 84 | Not reported | n/r | 223 | Gas | Withdrawn |
| 85 | Not reported | n/r | 223 | Gas | Withdrawn |
| 86 | Not reported | n/r | 223 | Gas | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner