Lee-Wommack North substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name Lee-Wommack North as the point of interconnection, all in Lenoir County, NC.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
22128 Not reported 230 79.8 Solar Withdrawn
22134 Not reported 230 79.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.