| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 565542 | Not reported | 230 | 160 | Solar | Withdrawn |
| 563066 | Not reported | 230 | 80 | Solar | Withdrawn |
| 896943 | Not reported | 230 | 80 | Solar | Withdrawn |
| 920609 | Not reported | 230 | 80 | Solar | Withdrawn |
| 961894 | Not reported | 230 | 80 | Solar | Withdrawn |
| 977272 | Not reported | 230 | 80 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.