Queue IDProjectkVMWResourceStatus
570092 Not reported 230 80 Solar Withdrawn
897027 Not reported 230 80 Solar Withdrawn
920637 Not reported 230 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.