0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name Jasper South - Wrights Chapel (SOCO) Tie as the point of interconnection, all in Hamilton County, FL.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
FC100015 Not reported 115 74.9 Solar Withdrawn
FC100016 Not reported 115 74.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.