Jacksonville - New Bern substation interconnection queue
0 active projects
totaling 0 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).
3 Duke Energy queue filings name Jacksonville - New Bern as the point of interconnection, all in Onslow County, NC.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
15650
Not reported
230
72
Solar
Withdrawn
15739
Not reported
230
72
Solar
Withdrawn
44634
Not reported
230
72
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.