3 active projects totaling 1,047 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).
8 Duke Energy queue filings name Holopaw Substation as the point of interconnection, all in Osceola County, FL.
3active projects
1,047active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 142 | Not reported | n/r | 616.6 | Solar | Withdrawn |
| 4 | Not reported | 230 | 537 | Gas | Active |
| 72 | Not reported | n/r | 340 | Gas | Operational |
| 74 | Not reported | n/r | 170 | Gas | Operational |
| 226 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 133 | Not reported | n/r | 14.4 | Other | Withdrawn |
| 121 | Not reported | n/r | 11.8 | Other | Withdrawn |
| 132 | Not reported | n/r | 11.2 | Other | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.