Holopaw Substation substation interconnection queue

3 active projects totaling 1,047 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).

8 Duke Energy queue filings name Holopaw Substation as the point of interconnection, all in Osceola County, FL.

3active projects
1,047active MW
8total filed
Queue IDProjectkVMWResourceStatus
142 Not reported n/r 616.6 Solar Withdrawn
4 Not reported 230 537 Gas Active
72 Not reported n/r 340 Gas Operational
74 Not reported n/r 170 Gas Operational
226 Not reported n/r 74.5 Solar Withdrawn
133 Not reported n/r 14.4 Other Withdrawn
121 Not reported n/r 11.8 Other Withdrawn
132 Not reported n/r 11.2 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.