1 active project totaling 100 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

2 Duke Energy queue filings name HARRIS PLANT - WAKE as the point of interconnection, all in Wake County, NC.

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
568598 Not reported 230 152 Solar Withdrawn
919393 Not reported 230 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.