Ginnie Substation substation interconnection queue

2 active projects totaling 149.8 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

6 Duke Energy queue filings name Ginnie Substation as the point of interconnection, all in FL.

2active projects
149.8active MW
6total filed
Queue IDProjectkVMWResourceStatus
190A Not reported n/r 74.9 Solar Operational
294 Not reported 69 74.9 Solar Withdrawn
295 Not reported 69 74.9 Solar Operational
194A Not reported n/r 40 Solar Withdrawn
246 Not reported n/r 40 Solar Withdrawn
189B Not reported n/r 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.