Substation Scout

Gilchrist Substation substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name Gilchrist Substation as the point of interconnection, all in Gilchrist County, FL.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
90 Not reported n/r 868 Gas Withdrawn
88 Not reported n/r 546 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.