Ft White - Suwannee River substation interconnection queue

3 active projects totaling 224.7 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

5 Duke Energy queue filings name Ft White - Suwannee River as the point of interconnection, all in Suwannee County, FL.

3active projects
224.7active MW
5total filed
Queue IDProjectkVMWResourceStatus
305 Not reported n/r 74.9 Solar Suspended
307 Not reported n/r 74.9 Solar Suspended
308 Not reported n/r 74.9 Solar Suspended
309 Not reported n/r 74.9 Solar Withdrawn
310 Not reported n/r 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.