0 active projects
totaling 0 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).
3 Duke Energy queue filings name Ft White - Perry as the point of interconnection, all in Suwannee County, FL.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
223
Not reported
n/r
74.9
Solar
Withdrawn
224
Not reported
n/r
74.9
Solar
Withdrawn
206
Not reported
n/r
45.4
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.