Fort White Substation substation interconnection queue
0 active projects
totaling 0 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).
3 Duke Energy queue filings name Fort White Substation as the point of interconnection, all in FL.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
167
Not reported
n/r
74.5
Solar
Withdrawn
244
Not reported
n/r
74
Solar
Withdrawn
245
Not reported
n/r
74
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.