Fort Meade Substation substation interconnection queue
0 active projects
totaling 0 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).
5 Duke Energy queue filings name Fort Meade Substation as the point of interconnection, all in Polk County, FL.
0active projects
0active MW
5total filed
Queue ID
Project
kV
MW
Resource
Status
145
Not reported
n/r
74.8
Solar
Withdrawn
272
Not reported
n/r
74.8
Solar
Withdrawn
117
Not reported
n/r
58.4
Other
Withdrawn
131
Not reported
n/r
10
Other
Withdrawn
134
Not reported
n/r
10
Other
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.