Fort Meade Substation substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).

5 Duke Energy queue filings name Fort Meade Substation as the point of interconnection, all in Polk County, FL.

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
145 Not reported n/r 74.8 Solar Withdrawn
272 Not reported n/r 74.8 Solar Withdrawn
117 Not reported n/r 58.4 Other Withdrawn
131 Not reported n/r 10 Other Withdrawn
134 Not reported n/r 10 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.