Florida substation interconnection queue

1 active project totaling 26.1 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

4 Duke Energy queue filings name Florida as the point of interconnection, all in Greenwood County, SC.

1active projects
26.1active MW
4total filed
Queue IDProjectkVMWResourceStatus
962624 Not reported 44 74.9 Solar Withdrawn
957449 Not reported n/r 26.1 Solar Active
918641 Not reported n/r 25 Solar Withdrawn
566014 Not reported 44 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.