Substation Scout

FLORIDA substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name FLORIDA as the point of interconnection, all in Greenwood County, SC.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
963168 Not reported 44 74.9 Solar Withdrawn
963123 Not reported 44 25 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first