Fisheating Creek Substation substation interconnection queue

2 active projects totaling 149.8 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

9 Duke Energy queue filings name Fisheating Creek Substation as the point of interconnection, all in FL.

2active projects
149.8active MW
9total filed
Queue IDProjectkVMWResourceStatus
37 Not reported n/r 145 Other Withdrawn
175 Not reported n/r 74.9 Solar Withdrawn
177 Not reported n/r 74.9 Solar Withdrawn
256 Not reported n/r 74.9 Solar Withdrawn
257 Not reported n/r 74.9 Solar Withdrawn
258 Not reported n/r 74.9 Solar Active
259 Not reported n/r 74.9 Solar Active
304 Not reported n/r 74.9 Solar Withdrawn
FC100005 Not reported 230 74.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.