DOVESVILLE NUCOR TAP LINE substation interconnection queue

1 active project totaling 74.9 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

3 Duke Energy queue filings name DOVESVILLE NUCOR TAP LINE as the point of interconnection, all in Darlington County, SC.

1active projects
74.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
957111 Not reported 230 75 Solar Withdrawn
566542 Not reported 230 74.9 Solar Active
915767 Not reported 230 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.