Substation Scout

DARLINGTON COUNTY PLANT - FLORENCE LINE substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

4 Duke Energy queue filings name DARLINGTON COUNTY PLANT - FLORENCE LINE as the point of interconnection, all in SC.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
225140 Not reported 230 70 Solar Withdrawn
913189 Not reported 230 70 Solar Withdrawn
962757 Not reported 230 70 Solar Withdrawn
569996 Not reported 230 66 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.