Dan River CTCC Station substation interconnection queue

1 active project totaling 28 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

2 Duke Energy queue filings name Dan River CTCC Station as the point of interconnection, all in Rockingham County, NC.

1active projects
28active MW
2total filed
Queue IDProjectkVMWResourceStatus
956180 Not reported 100 99 Battery Withdrawn
956974 Not reported 100 28 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.