CUMBERLAND - DELCO substation interconnection queue

1 active project totaling 80 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

3 Duke Energy queue filings name CUMBERLAND - DELCO as the point of interconnection, all in Bladen County, NC.

1active projects
80active MW
3total filed
Queue IDProjectkVMWResourceStatus
564510 Not reported 230 80 Solar Active
566240 Not reported 230 80 Solar Withdrawn
961752 Not reported 230 79.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.