0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name Cumberland-Delco as the point of interconnection, all in Sampson County, NC.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
18049 Not reported 230 80 Solar Withdrawn
18052 Not reported 230 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.