Substation Scout

Clinton substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

4 Duke Energy queue filings name Clinton as the point of interconnection, all in SC.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
918639 Not reported n/r 74.9 Solar Withdrawn
63666 Not reported n/r 55 Solar Withdrawn
126078 Not reported n/r 40 Solar Withdrawn
920631 Not reported n/r 38.3 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.