0 active projects
totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).
2 Duke Energy queue filings name Chester; N/A as the point of interconnection, all in Chester County, SC.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
16298
Not reported
n/r
39
Solar
Withdrawn
15376
Not reported
n/r
15
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.