Substation Scout

Chariot Switching Station substation interconnection queue

2 active projects totaling 149.8 MW in the Duke Energy queue.

2 Duke Energy queue filings name Chariot Switching Station as the point of interconnection, all in Suwannee County, FL.

2active projects
149.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
218 Not reported n/r 74.9 Solar Active
290 Not reported n/r 74.9 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first