CHAMPION substation interconnection queue

1 active project totaling 200 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

3 Duke Energy queue filings name CHAMPION as the point of interconnection, all in Newberry County, SC.

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
957146 Not reported n/r 200 Solar Active
957261 Not reported n/r 100 Battery Withdrawn
962883 Not reported 100 48 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.