Champion substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

3 Duke Energy queue filings name Champion as the point of interconnection, all in SC.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
917547 Not reported n/r 75 Solar Withdrawn
569756 Not reported n/r 48 Solar Withdrawn
919083 Not reported n/r 48 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.