Central Florida Substation substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

4 Duke Energy queue filings name Central Florida Substation as the point of interconnection, all in FL.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
8 Not reported 230 1,150 Nuclear Withdrawn
21 Not reported n/r 597 Gas Withdrawn
22 Not reported n/r 597 Gas Withdrawn
23 Not reported n/r 597 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.