Central Florida Substation substation interconnection queue
0 active projects
totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).
4 Duke Energy queue filings name Central Florida Substation as the point of interconnection, all in FL.
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
8
Not reported
230
1,150
Nuclear
Withdrawn
21
Not reported
n/r
597
Gas
Withdrawn
22
Not reported
n/r
597
Gas
Withdrawn
23
Not reported
n/r
597
Gas
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.