0 active projects
totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).
4 Duke Energy queue filings name Brookridge Substation as the point of interconnection, all in Hernando County, FL.
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
92
Not reported
n/r
1,263
Gas
Withdrawn
106
Not reported
n/r
450
Gas
Withdrawn
25
Not reported
n/r
133
Coal
Withdrawn
97
Not reported
n/r
17
Coal
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.