Brookridge Substation substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

4 Duke Energy queue filings name Brookridge Substation as the point of interconnection, all in Hernando County, FL.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
92 Not reported n/r 1,263 Gas Withdrawn
106 Not reported n/r 450 Gas Withdrawn
25 Not reported n/r 133 Coal Withdrawn
97 Not reported n/r 17 Coal Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.