Bennettsville Switching Station - Laurinburg 230 k substation interconnection queue
0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 205718 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 177122 | Not reported | n/r | 69.9 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.