Substation Scout

Bennettsville Switching Station - Laurinburg 230 k substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
205718 Not reported n/r 74.9 Solar Withdrawn
177122 Not reported n/r 69.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first