BENNETTSVILLE SW STA - LAURINBURG substation interconnection queue
0 active projects
totaling 0 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).
0active projects
0active MW
7total filed
Queue ID
Project
kV
MW
Resource
Status
566096
Not reported
230
200
Solar
Withdrawn
568988
Not reported
230
80
Solar
Withdrawn
897025
Not reported
230
80
Solar
Withdrawn
565074
Not reported
230
75
Solar
Withdrawn
568444
Not reported
230
75
Solar
Withdrawn
569524
Not reported
230
60
Solar
Withdrawn
897033
Not reported
230
60
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.