0 active projects totaling 0 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
566096 Not reported 230 200 Solar Withdrawn
568988 Not reported 230 80 Solar Withdrawn
897025 Not reported 230 80 Solar Withdrawn
565074 Not reported 230 75 Solar Withdrawn
568444 Not reported 230 75 Solar Withdrawn
569524 Not reported 230 60 Solar Withdrawn
897033 Not reported 230 60 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.