Atwater Substation substation interconnection queue

2 active projects totaling 149 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

3 Duke Energy queue filings name Atwater Substation as the point of interconnection, all in Gadsden County, FL.

2active projects
149active MW
3total filed
Queue IDProjectkVMWResourceStatus
250 Not reported n/r 74.9 Solar Withdrawn
235 Not reported n/r 74.5 Solar Operational
236 Not reported n/r 74.5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.