1 active project totaling 74.5 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

4 Duke Energy queue filings name Archer Substation as the point of interconnection, all in Alachua County, FL.

1active projects
74.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
184 Not reported n/r 74.9 Solar Withdrawn
231 Not reported n/r 74.9 Solar Withdrawn
276 Not reported n/r 74.9 Solar Withdrawn
284 Not reported n/r 74.5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.