Duke Energy request PP00036

Duke Energy queue ID PP00036

Queue request PP00036 was listed in the Duke Energy interconnection queue at the end of 2025 as a 70 MW project in Robeson County, NC, according to Berkeley Lab’s queue data file. The filing names Weatherspoon - Fayetteville 230 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2028.

Queue IDPP00036
Project nameNot reported
Status (as published)Active
SubstationWeatherspoon - Fayetteville 230
Point of interconnectionWeatherspoon - Fayetteville 230
CountyRobeson
StateNC
VoltageNot reported
Capacity70 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2028-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Robeson, NC: 21 requests in the Duke Energy queue, 9 active totaling 945.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Provisional Interconnection Request Validation
Queue date2025-07-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.