Queue request 977298 was listed in the Duke Energy interconnection queue at the end of 2025 as a 300 MW project in Wake County, NC, according to Berkeley Lab’s queue data file. The filing names HARRIS PLANT - RTP as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID977298
Project nameNot reported
Status (as published)Active
SubstationHARRIS PLANT - RTP
Point of interconnectionHARRIS PLANT - RTP 230KV
CountyWake
StateNC
Voltage230 kV
Capacity300 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

HARRIS PLANT - RTP substation: 2 requests in the Duke Energy queue, 1 active totaling 300 MW.

Queue IDProjectMWResourceStatus
899005Not reported199.9BatteryWithdrawn

Wake, NC: 15 requests in the Duke Energy queue, 7 active totaling 872 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Cluster2025 DISIS
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study - Study Complete
Queue date2025-06-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.