Substation Scout

Duke Energy request 977286

Duke Energy queue ID 977286

Queue request 977286 was listed in the Duke Energy interconnection queue at the end of 2025 as a 250 MW battery project in Stokes County, NC, according to Berkeley Lab’s queue data file. The filing names Rural Hall BL/WH as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID977286
Project nameNot reported
Status (as published)Active
SubstationRural Hall BL/WH
Point of interconnectionRural Hall BL/WH 230 kV
CountyStokes
StateNC
Voltage230 kV
Capacity250 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Stokes, NC: 5 requests in the Duke Energy queue, 3 active totaling 1,160 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2025 DISIS
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study - Study Complete
Queue date2025-06-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.