Substation Scout

Duke Energy request 9637

Duke Energy queue ID 9637

Queue request 9637 was listed in the Duke Energy interconnection queue at the end of 2025 as a 60 MW solar project, according to Berkeley Lab’s queue data file. The filing names Parkdale America PL 21 as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2017.

Queue ID9637
Project nameNot reported
Status (as published)Operational
SubstationParkdale America PL 21
Point of interconnectionParkdale America PL 21
CountyNot reported
StateNot reported
VoltageNot reported
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2017-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

DeveloperMonroe Solar Farm
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Commercial Operation - Commercial Operation Date Declared
Queue date2015-04-28
Operational date2017-03-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.