Duke Energy request 956971
Duke Energy queue ID 956971
Queue request 956971 was listed in the Duke Energy interconnection queue at the end of 2025 as a 28 MW gas project in Rowan County, NC, according to Berkeley Lab’s queue data file. The filing names BUCK CTCC STA YARD as its point of interconnection. Its status as of December 31, 2025 was “Active”.
| Queue ID | 956971 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | BUCK CTCC STA YARD |
| Point of interconnection | BUCK CTCC STA YARD 230 kV |
| County | Rowan |
| State | NC |
| Voltage | 230 kV |
| Capacity | 28 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rowan, NC: 7 requests in the Duke Energy queue, 3 active totaling 2,103 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Carolinas |
|---|---|
| Cluster | 2024 DISIS |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Phase 3 Cluster Study - Study Complete |
| Queue date | 2024-06-11 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.