Duke Energy request 899581

Duke Energy queue ID 899581

Queue request 899581 was listed in the Duke Energy interconnection queue at the end of 2025 as a 20 MW gas project in Wayne County, NC, according to Berkeley Lab’s queue data file. The filing names Lee Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID899581
Project nameNot reported
Status (as published)Active
SubstationLee Substation
Point of interconnectionLee Substation 115 kV
CountyWayne
StateNC
Voltage115 kV
Capacity20 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wayne, NC: 36 requests in the Duke Energy queue, 23 active totaling 1,282.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
DeveloperDuke Energy Progress, LLC
Cluster2023 DISIS
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - Pending
Queue date2023-06-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first