Duke Energy request 898999
Duke Energy queue ID 898999
Queue request 898999 was listed in the Duke Energy interconnection queue at the end of 2025 as a 199.9 MW battery project in Robeson County, NC, according to Berkeley Lab’s queue data file. The filing names Weatherspoon Plant Station as its point of interconnection. Its status as of December 31, 2025 was “Active”.
| Queue ID | 898999 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Weatherspoon Plant Station |
| Point of interconnection | Weatherspoon Plant Station |
| County | Robeson |
| State | NC |
| Voltage | Not reported |
| Capacity | 199.9 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Robeson, NC: 21 requests in the Duke Energy queue, 9 active totaling 945.9 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Progress |
|---|---|
| Developer | Masked |
| Cluster | 2023 DISIS |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Engineering Design - In Progress |
| Queue date | 2023-06-28 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.