Substation Scout

Duke Energy request 897777

Duke Energy queue ID 897777

Queue request 897777 was listed in the Duke Energy interconnection queue at the end of 2025 as a 2 MW project in Wake County, NC, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 6, 2025.

Queue ID897777
Project nameNot reported
Status (as published)Active
SubstationNot reported
Point of interconnectionNot reported
CountyWake
StateNC
VoltageNot reported
Capacity2 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online date2025-11-06
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wake, NC: 15 requests in the Duke Energy queue, 7 active totaling 872 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Cluster2023 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Construction - Pending
Queue date2023-06-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.